Restart or clean address <RESET> | <CLEAN URI> |
Reduction Matrix        
Search schematics: ?

Add a schematic from list



Add schematic(s) by ID
List all schematics <A big list here>

Loaded schematics list
Craft info
Manufacture 80 (80) Production 80 (80)
Type Module Tech level 8 (8)
Total Cost 990,760 Ship equip No
Schematic XP 1,000 Total XP 39,600
Total Cost / Total XP 25
Store Coopers Schematic Supply (x1)
Mero Brothers (x3)
All resources
NameQuantityTotal Price
Construction Components720128,160
High Tech Components500164,500
Isotopes1,800136,800
Plasteel2,600330,200
Refined Chemicals40028,800
Refined Metal1,200103,200
Tryonite Ore10099,100
Schematic resources
NameQuantityTotal Price
High Tech Components500164,500
Isotopes1,800136,800
Plasteel1,400177,800
Tryonite Ore10099,100
All components
NameQuantityTotal Price
Drill Rig (Small)80227,360
Hopper Unit (Large)40185,200
Hopper Unit (Small)80113,680
Schematic components
NameQuantityTotal Price
Drill Rig (Small)80227,360
Hopper Unit (Large)40185,200
Used in directly
Extractraction UnitIndustrial Extractor (Flora)
Industrial Extractor (Fuel)Industrial Extractor (Gas)
Industrial Extractor (Liquid)Industrial Extractor (Metal)
Industrial Extractor (Mineral)Industrial Extractor (Radioactives)
Used in schematics
Industrial Extractor (Flora)Industrial Extractor (Fuel)
Industrial Extractor (Gas)Industrial Extractor (Liquid)
Industrial Extractor (Metal)Industrial Extractor (Mineral)
Industrial Extractor (Radioactives)Settlement Fabricator
Click HERE to open the graph in its own page.
Industrial Drill Unit (x20)
Drill Rig (Small) (x80)
Hopper Unit (Small) (x80)Hopper Unit (Large) (x40)